Magdeburg facing traffic chaos: Demolition of the Ring Bridge starts today!

Transparenz: Redaktionell erstellt und geprüft.
Veröffentlicht am

Demolition of the ring bridge in Magdeburg begins on October 13, 2025. Detours and traffic jam information provided for drivers.

Abriss der Ringbrücke in Magdeburg beginnt am 13. Oktober 2025. Umleitungen und Stauinformationen für Autofahrer bereitgestellt.
Demolition of the ring bridge in Magdeburg begins on October 13, 2025. Detours and traffic jam information provided for drivers.

Magdeburg facing traffic chaos: Demolition of the Ring Bridge starts today!

In Magdeburg, the ring bridge over Brenneckestrasse is about to be demolished. This step significantly affects the city's transport infrastructure, as the entire area around the bridge will be closed from Monday, October 13th. These measures will turn the south of Magdeburg into a bottleneck, which can lead to significant traffic jams. The city provides citizens with comprehensive information about the best route through the city and warns of possible traffic jams that could occur in the coming days.

How People's voice Reportedly, preparations for the demolition began on Monday morning. The city has announced that the entrance and exit into the city will be closed from 7 a.m., followed by the exit from the city, which will no longer be accessible from 3 p.m. These measures are intended to help reorganize traffic in the affected region and minimize potential dangers from falling debris.

Diversion measures

The city strongly recommends that you avoid the A14 motorway as far as possible in order to avoid the entire area of ​​Brenneckestrasse. Instead, the diversion takes you via Kirschweg and Leipziger Straße. The aim of these traffic control measures is to maintain traffic flow in other parts of the city and to relieve congestion on the main traffic arteries.

In addition to the closure, a fall bed will be created from Tuesday into which sand will be piled up under the bridge. This measure serves to protect the roads, sidewalks and lines beneath the bridge by catching any falling debris and dampening the vibrations during demolition. Loud MDR These steps are necessary to ensure the safety of traffic routes and minimize the impact on residents.