Traffic chaos in Netphen: Wittgensteiner Straße closed until August!

Traffic chaos in Netphen: Wittgensteiner Straße closed until August!
Netphen, Deutschland - traffic restrictions in North Rhine-Westphalia are currently characterized by extensive maintenance and expansion work. Since April 1, 2025, there have been considerable traffic disruptions on Wittgensteiner Straße in Netphen, especially in the area of Walpersdorf. These measures last until August 26, 2025, which means a longer phase with higher traffic loads and a significant risk of innovation. Loud News.de The L719 is fully blocked in both directions, which includes a distance of 1.62 kilometers.
vehicles that are traveling towards Biedenkopf must expect detours. These lead over Deuz, Netphen, Niedernetphen, B62, Eschenbach, Afholderbach, Lützel, Erndtebrück, Schameder, Leimstruth, Holzhausen and Saßmannshausen. There are also diversions for oncoming traffic that include a similar route.
other construction sites in North Rhine-Westphalia
Wittgensteiner Straße is not the only street in North Rhine-Westphalia affected by construction sites. Furthermore, bridge work is scheduled on the A1 motorway, which runs in Cologne towards Euskirchen. These last from June 16, 2025 to July 28, 2025. A left lane is blocked according to information from Verkehrslage.de , when the road is narrowed into two traces.
Similar work takes place on the A61 between Koblenz and Mönchengladbach, where a lane is also temporarily blocked. The restrictions are diverse in the region and further road work is to be expected, especially with regard to the bridges between the Erftstadt and Kreuz Bliesheim on the A1.
Stammfahr and traffic safety
The large number of construction sites not only lead to traffic jams, but also harbors traffic safety risks. There is an increased attention, especially in the areas with poor visibility or slippery conditions. The most common reasons for traffic disorders also include ghost drivers who pose an additional risk to all road users.
The traffic situation remains tense and drivers have to adjust to longer travel times and possible traffic disruptions. While the construction work continues to progress, local diversions and traffic information are essential for a smooth crossing.
Details | |
---|---|
Ort | Netphen, Deutschland |
Quellen |